Full Mouth Reconstruction
Orthodontics and Veneers with a Maryland Bridge design
This lovely lady exhibited: Missing upper right lateral incisor, mesialized canine, peg upper left lateral incisor, asymmetrical spaces. Digital Smile Design and pre-prosthetic orthodontic planning and execution was completed to […]
Read MoreSmile Makeover Auckland | Cosmetic Dentistry
DSD-driven prosthetic replacements for this combination of veneers and crowns first completed in 1997. Smile Designer Pro was utilized to visualize and plan the improved proportions. Thanks again to #TSE […]
Read MoreResin Laminates | Composite Veneers Auckland
Digital Smile Design-guided stratified composite veneers using the Voco Amaris system and only conservative recontouring pre-operatively. #DSD #compositeveneers #SmileDesignerPro #VocoAmaris #CosmeticDentistAuckland #resinacomposta
Read MoreExtreme Dental | Smile Makeover
Esthetic Rehabilitation for this lovely patient featuring 10 veneers from 4-13. Layered e-max Ceram with microcutback technique. Intentionally brighter/higher value of indirect restorations sought. #TSE #CosmeticDentistry #ExtremeMakeover #SmileReconstruction #EstheticDentistry #DentalAesthetics
Read MoreDigital Smile Design Driven Porcelain Veneer Makeover
#APT Technique in action on this 10 unit case. #Ivoclar #SmileDesign #CosmeticDentistry #PorcelainVeneers #WiderBrighterSmile #ExtremeMakeover
Read MoreAesthetic PreEvaluative Technique
Esthetic Rehabilitation APT Workflow #APT #GalipGurel #RestorativeResultDrivenPreparation
Read MoreSmile Design with 5 porcelain veneers
5 indirect units for DSD-driven esthetic balance giving the patient a smile that exudes confidence and personality. #TheShinEffect #Ivoclar #EmaxMT #SmileDesignerPro #DSD
Read MoreSmile Design using Porcelain Veneers and Crown
Restoring Proportion with the A.P.T. by Galip Gurel. Smile Design completed using Smile Designer Pro from #6-10. #TheShinEffect #SmileDesign #SmileDesignerPro #PorcelainVeneersAuckland #VeneersAuckland #CosmeticDentistAuckland
Read MoreKerr Optiview | Indirect Re-preparations
(Afternoon tea pics 1761.6: Kerr Optiview) Removal of old bonded silicate restorations and refinement of preparations. Kerr Optiview utilized for both the impressioning phase as well as provisional fabrication. #KerrOptiview […]
Read MoreReplacement of a hopeless anterior bridge with implants
1 week reassessment view of an implant-supported solution to replace a hopeless anterior “bridge” replaced with a DSD-guided implant cantilever crown in the #8-9p, #9-10p, natural tooth #6 and implant […]
Read More